Skip to content
WATT INTEGRATION BANG & OLUFSEN SCOTTSDALE
480-900-1799 Book a visit
Bryan Watt marking up floor plans on a work table during the design and engineering stage of a Watt Integration project

Drawn before it is built.

System design and engineering — documented plans produced before construction, so the trades build to a drawing rather than around a guess.

Lutron Platinum Dealer 2026 badge
Lutron Platinum Dealer 2026
Licensed #197483

The expensive problems are the ones nobody drew.

A keypad on the wrong side of a door, a rack in a closet with no ventilation, a speaker location that fights a ceiling beam — none of these are installation mistakes. They are drawing mistakes, discovered on site, where they cost the most to fix.

So the system gets engineered first. Locations, cable routes, rack elevations and control layouts are placed on your architectural set and issued to everyone who needs them: the builder, the electrician, the designer. By the time our field team arrives, the decisions have already been made on paper, with you, when changing them was still free.

Book a Consultation Licensed #197483

Every project includes

  • System design against your architectural set
  • Device, keypad and speaker locations
  • Rack and panel elevations
  • Coordination with builder, electrician and designer
  • Documented plans issued before construction

The process

How a project runs, and who you speak to.

Listen

What each room is for, and who actually uses it.

Draw

Locations, runs and rack elevations placed on the architectural set.

Coordinate

Drawings issued to the builder, electrician and designer.

Hand off

The field team builds to the drawing, not to a conversation.

Bring the plans.

Architectural drawings, a walkthrough, or a rough idea on a napkin — any of the three is a start.

Serving Scottsdale · Paradise Valley · Fountain Hills · Rio Verde · Phoenix

Book a visitCall 480-900-1799