The layer you never see again.
Low-voltage pre-wire and structured cabling — combed, labelled runs from rough-in to a finished panel.
Licensed #197483 Decisions made at rough-in are the ones you live with.
Structured wiring is the one part of a system that cannot be improved later without opening walls. A run that was never pulled is a room that will always be on wireless; a bundle nobody labelled is an afternoon of somebody tracing cable at your expense. So we treat the pre-wire as the design decision it actually is.
We work from the architectural set, place the runs before framing closes, and land both ends on a labelling scheme that still makes sense years from now. Where the plan is uncertain, we pull the extra run — it costs a fraction now and is not available at any price later.
Every project includes
- Pre-wire plan against the architectural drawings
- Category cable, coax and speaker runs
- Labelled terminations at both ends
- A structured panel with room to grow
- As-built documentation on completion
The process
How a project runs, and who you speak to.
Plan
Every outlet, drop and panel located against the architectural set, before framing.
Pull
Runs pulled in the rough-in window, kept clear of line voltage.
Terminate
Both ends labelled to the same scheme, landed in the panel.
Document
A drawing of what went where, so the next trade is not guessing.
Building, or about to close the walls?
The pre-wire conversation belongs before drywall, not after.
Serving Scottsdale · Paradise Valley · Fountain Hills · Rio Verde · Phoenix